At a glance

GOGO lists 15 kg payload and a 550 mm passage. Run lists 10 kg and a 550 mm base diameter. Yunji limits Run supply to remaining inventory. If replacing a Run, measure the existing dock, lift entry and collection workflow again with GOGO’s two compartments fitted and loaded.

Published specifications

SpecificationGOGORun
Total payload · Different published figures15 kg[1]10 kg[2]
Body height · Different published figures975–1000 mm[1]Two heights in the series table.970 mm[2]
Net weight · Different published figures≤63 kg[1]45 kg[2]
Maximum working slope · Different published figures13 °[1]8 °[2]
Listed runtime6–8 h[1]6–8 h[2]
Minimum passage550 mm[1]No figure in the cited record
Body width420 mm[1]No figure in the cited record
Body length490 mm[1]No figure in the cited record
Maximum speed0.9–1.5 m/s[3]No figure in the cited record
Obstacle clearance height15 mm[2]Published curb clearance (1.5 cm).No figure in the cited record
Run chassis diameterNo figure in the cited record550 mm[2]
Manufacturer sources
  1. Yunji Technology HKEX Prospectus — Gogo Series specifications (p. 246) · PDF p. 246
  2. Yunji Technology HKEX Prospectus — Run Series specifications and phase-out (p. 247) · PDF p. 247
  3. Yunji GOGO product page

Which model fits the site?

GOGO

Shortlist GOGO for new delivery routes with narrow doors or two orders per departure. Check the installed lift interface with the integrator.

Run

Keep Run on the review list for installed fleets. Get a parts plan, firmware support dates and the approved migration steps.

Buyer questions

Can the robot use the existing lift?

Give the lift maintainer the controller model and identify the approved contact or API functions for the installed car. Test door status, a busy car, return to the correct floor and the response to a failed call with the robot supplier present.

How do I compare the compartment limits?

Weigh the full consignment and each package. Ask for the fitted openings, load position and any per-compartment limit. Set up a collection at the room using the largest carton and the hotel’s actual guest notification.

Should an installed Run be replaced immediately?

Yunji limits supply to remaining inventory and recommends GOGO or UP for new projects. Ask the local supplier for written parts and firmware support dates. Check whether the installed lift interface can be reused before budgeting the migration.